| |
A.
FOR JR. LEVELSUPERVISORS AND MIDDLE LEVEL SUPERVISIORS
|
Code
|
Courses
|
Duration
|
Maximum
No. of Participant's
|
Participant's
Level
|
|
JMS-1
|
Process
optimization, Process Control and Productivity Improvement
a) In Spinning & Spinning Preparatory
b) In Weaving & Weaving Preparatory
|
|
15
|
Both
for Jr. & Middle level supervisor with technical background
|
|
JMS-2
|
Raw
Jute Grading & Batch Selection
|
2
days
|
15
|
-
do -
|
|
JMS-3
|
Testing
& Quality Control
|
2
days
|
15-20
|
-
do -
|
|
JMS-4
|
Machinery Maintenance & Maintenance Audit (Mill Side)
|
3
days
|
15
|
-
do -
|
|
JMS-5
|
Machinery
Maintenance & Maintenance Audit (Factory Side)
|
3
days
|
15
|
-
do -
|
|
JMS-6
|
Waste
Control in Mill
|
2
days
|
15-20
|
-
do -
|
|
JMS-7
|
Material
Handling & Material Management
|
1
day
|
15-20
|
-
do -
|
|
JMS-8
|
Promotion
Teamwork, Cooperation and Coordination
|
1
day
|
15-20
|
-
do -
|
|
JMS-9
|
Managerial
Skill Development
|
6-8
weeks ( 2days per week at IJT)
|
25-30
|
-
do -
|
|
JMS-10
|
Safety
& Enviromental Management Awareness
|
2
days
|
15-20
|
-
do -
|
B.
FOR MIDDLE AND SENIOR LEVEL SUPERVISORS HAVING SUFFICIENT EXPERIENCE
|
Code
|
Courses
|
Duration
|
Maximum
No. of Participant's
|
Participant's
Level
|
|
MSS-1
|
Process
& Quality Control for 3 days 15-20 Middle & Senior Level export
yarn
|
|
15-20
|
Middle
& Senior Level export yarn Supervisor & Quality Control Personnel
|
|
MSS-2
|
New
Technology for Jute Industry
|
1
day
|
15-20
|
Middle
& Senior Level Supervisor & Managers/ Executives-
|
|
MSS-3
|
Fine
Yarn Spinning
|
1
day
|
15-20
|
Middle
& Senior Level Supervisor
|
|
MSS-4
|
Production of Fine Hessian & other Jute Decorative Fabric
|
2
days
|
15-20
|
-
do -
|
|
MSS-5
|
Speciality
in Bleaching, Dyeing & Finishing of Jute & their evaluation
|
3
days
|
15-20
|
-
do -
|
|
MSS-6
|
Utility
Conservation (conservation of water, steam, electric power 2 days
15-20 - do - and energy)
|
2
days
|
15-20
|
-
do -
|
|
MSS-7
|
Motivation
and Manpower 2 days 15-20 - do - Utilisation
|
2
days
|
15-20
|
-
do -
|
C. FOR
MANAGERS AND EXECUTIVES (INDUSTRY'S POLICY MAKER)
|
Code
|
Courses
|
Duration
|
Maximum
No. of Participant's
|
Participant's
Level
|
|
ME-1
|
New
Technology of Jute Industry
|
|
10-15
|
Middle
& Senior Level export yarn Supervisor & Quality Control Personnel
|
|
ME-2
|
Process
Optimisation and Process Control (same in Conventional Jute Processing
as JMS-1, but to be arranged separately)
a) Spinning
b) Weaving
|
|
10
|
Middle
& Senior Level Supervisor & Managers/ Executives-
|
|
ME-3
|
Computer
Application and Management Information System
|
8
weeks
(2
days per week)
|
10
|
Middle
& Senior Level Supervisor
|
|
ME-4
|
Materials Management and Resource Utilisation
|
2
days
|
10
|
-
do -
|
|
ME-5
|
Health,
Safety and Environment Management
|
2
days
|
10
|
-
do -
|
|
ME-6
|
Utility
Conservation (conservation of water, steam, electric power 2 days
15-20 - do - and energy)
|
2
days
|
10
|
-
do -
|
|
ME-7
|
TQC
and ISO-9000 Implementation
|
3
days
|
10
|
-
do -
|
D.
SUMMARY OF THE PROPOSED PROGRAMME SCHEDULE FOR WORKERS' TRAINING
FOR JUTE MILLS
|
Code
|
Courses
|
Duration
|
Maximum
No. of Participant's
|
Participant's
Level
|
|
WB1
|
Behavioural
Aspects for improving a) Work Culture b) House-keeping c) Productivity
d) Quality conciousness e) Waste Control etc. (These Training
will be carried out in collaboration with NITRA,SITRA & IJIRA)
|
|
15-30
|
Sardars
& Workers
|
|
WB2
|
Technical
Skill Development Training for Sardars (mill-based) in the following
areas:
WS1 (i) Batching
WS2 (iii) Carding
WS3 (ii) Drawing
WS4 (iii) Spinning
WS5 (iv) Cop & Spool Winding
WS6 (v) Sizing/Beaming
WS7 (vi) Hessian Looms
WS8 (vii) Sacking Looms
WS9 (viii) Sack Sewing & Finishing
WS10 (ix) Bleaching & Dyeing
WS11 (x) Printing
|
3 days
- do -
- do -
- do -
- do -
- do -
- do -
- do -
- do-
- do -
- do -
|
10
10
10
10
10
10
10
10
10
10
10
|
Respective Sardars
- do -
- do -
- do -
- do -
- do -
- do -
- do -
- do -
- do -
- do -
|
|
WB3
|
Technical Skill Development Training for General Workmen of Jute
Industry in the areas mentioned above for Sardars' training.
|
3
days
|
10
|
Respective
Workers
|
|
|
 |